1. The formula
A cycle has two phases. During heat-up the elements run at full power. During curing they only run part of the time, to make up the losses.
Energy (kWh) = power × heat-up time + power × load factor × curing time + fan × total time.
2. A worked example
Assumptions, to replace with your own: 15 kW oven, 40-minute heat-up, 20-minute cure with elements active 35% of the time, 0.75 kW fan, electricity at €0.20 per kWh.
| Heat-up: 15 kW × 0.67 h | 10 kWh |
| Cure: 15 kW × 35% × 0.33 h | 1.75 kWh |
| Fan: 0.75 kW × 1 h | 0.75 kWh |
| Total | 12.5 kWh, about €2.50 |
|---|
These durations are calculation assumptions, not measurements: real heat-up depends on the oven, the load and the workshop temperature. We will publish our measured times after testing.
3. Cutting the bill
- Run cycles back to back: the first cycle of the day is the most expensive; the next ones start from a hot oven.
- Fill the oven: curing two parts costs almost the same as curing one.
- Keep the door shut and maintain the seal: every opening loses heat.
- Follow the powder data sheet: curing longer than needed is pointless.
4. Compare with outsourcing
The real calculation compares what you pay a subcontractor today with what curing in-house would cost: powder, energy, time. Our payback calculator does it in seconds.