On 400 V three-phase, the current per phase is I = P ÷ (1.73 × 400). For heating elements, kW and kVA are practically the same.
| Heating power | Current per phase | BRELSAS plug |
|---|---|---|
| 6 kW | ≈ 8.7 A | CEE 16 A |
| 9 kW | ≈ 13 A | CEE 16 A |
| 12 kW | ≈ 17.3 A | CEE 32 A |
| 15 kW | ≈ 21.7 A | CEE 32 A |
| 18 kW | ≈ 26 A | CEE 32 A |
Add the fan (less than one kilowatt). The oven always goes on a dedicated circuit with a suitable breaker and a 30 mA RCD; your electrician sizes the cable for the run length.
2. Your supply sets the ceiling
A business on three-phase typically has a contracted power of 12 to 36 kVA (in France, above that a dedicated tariff applies). Everything running at the same time adds up: compressor, booth extraction, lighting, other machines. The oven must fit in what is left, with a margin.
Example: 18 kVA supply, 3 kW compressor and 1.5 kW extraction running. About 13.5 kVA remains, minus a 1.5 kW margin: a 12 kW oven fits, a 15 kW oven does not.
3. If your supply is tight
- Choose a lower power: at BRELSAS the S comes in 6 to 12 kW, the M and XL in 9 to 18 kW, all at the same price. Same maximum temperature, slower heat-up.
- Do not run everything at once: start the oven heat-up while the compressor is off, for instance.
- Increase your contracted power: possible, but it raises the monthly standing charge and sometimes requires work.
4. What does a slower heat-up change?
Heat-up takes longer, especially for the first cycle of the day. Once hot, the oven only uses energy to make up its losses, so the gap narrows on the following cycles. For a workshop running a few cycles a day, it is often a good compromise.
Before ordering: ask your electrician for your contracted power, the space in the switchboard and whether a 16 A or 32 A circuit can be run. Then try our power calculator.